L 77a, Rastatt Tunnel
2016-02-27 09:24
by Dürr Group GmbH

L 77a, Rastatt Tunnel

Retrofitting of tunnel engineering and safety equipment

Customer: Karlsruhe Regional Council –
Bühl Building Management
Completion: 2008
Tunnel length: 1020 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation

L 77a, Rastatt Tunnel
Symbolic: L 77a, Rastatt Tunnel

Go back

© 2023 DÜRR Group GmbH. All rights reserved.