2016-02-27 09:24
L 77a, Rastatt Tunnel
Retrofitting of tunnel engineering and safety equipment
Customer: | Karlsruhe Regional Council – Bühl Building Management |
---|---|
Completion: | 2008 |
Tunnel length: | 1020 m |
Tube: | 1 |
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
