L 562 Wattkopf Tunnel
2016-02-24 09:29
by Dürr Group GmbH

L 562 Wattkopf Tunnel

Retrofitting of operating facilities and tunnel ventilation

Customer: Karlsruhe Regional Council
Completion: 2008
Tunnel length: 1950 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, escape passage lighting, CCTV, intercom system, fire alarm system, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation

L 562 Wattkopf Tunnel
Symbolic: L 562 Wattkopf Tunnel

Go back

© 2023 DÜRR Group GmbH. All rights reserved.