2016-02-15 10:30
B62/L280 St. Barbara Tunnel, Betzdorf
Technical tunnel equipment
Customer: | Koblenz Road and Traffic Department |
---|---|
Completion: | 2006 |
Tunnel length: | 380 m |
Tube: | 1 |

Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system, CCTV, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system