B38 Saukopf Tunnel
2016-02-27 09:30
by Dürr Group GmbH

B38 Saukopftunnel

Nachrüstung Technische Ausstattung

Customer: Karlsruhe Regional Council - Heidelberg office
Completion: 2008
Tunnel length: 2715 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation

B38 Saukopftunnel
Symbolic: B38 Saukopftunnel

Go back

© 2023 DÜRR Group GmbH. All rights reserved.