2016-02-24 09:27
B277 Schlossberg Tunnel, Dillenburg
Technical tunnel equipment
Customer: | Koblenz Road and Traffic Department |
---|---|
Completion: | 2007 |
Tunnel length: | 780 m |
Tube: | 1 |
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Medium voltage system, low voltage main distribution system, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
