2016-03-02 09:30
B14 Leutenbach tunnel
Technical tunnel equipment
Customer: | Stuttgart Regional Council – Waiblingen Building Department |
---|---|
Completion: | 2009 |
Tunnel length: | 1080 m |
Tube: | 1 |
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
