B14 Leutenbach tunnel
2016-03-02 09:30
by Dürr Group GmbH

B14 Leutenbach tunnel

Technical tunnel equipment

Customer: Stuttgart Regional Council –
Waiblingen Building Department
Completion: 2009
Tunnel length: 1080 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation

B14 Leutenbach tunnel
Symbolic: B14 Leutenbach tunnel

Go back

© 2023 DÜRR Group GmbH. All rights reserved.