2016-03-05 08:00
B10, Annweiler tunnel group
Retrofitting of operating technology and tunnel ventilation
Customer: | Landesbetrieb Mobilität Speyer |
---|---|
Completion: | 2010 (1.BA) |
Tunnel length: | - Kostenfels 305 m (section 1) - Staufer 1038 m (section 1) - Löwenherz 895 m (section 2) - Barbarossa 790 m (section 2) |
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation