AK Memmingen Tunnel, A7
2016-02-24 09:26
by Dürr Group GmbH

AK Memmingen Tunnel, A7

Retrofitting of operating facilities

Customer: Southern Bavaria Motorway Directorate,
Kempten office
Completion: 2007
Tunnel length: 177 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, emergency telephones, control centre technology, tunnel radio system

AK Memmingen Tunnel, A7
Symbolic: AK Memmingen Tunnel, A7

Go back

© 2023 DÜRR Group GmbH. All rights reserved.