A62 Hörnchenberg Tunnel
2016-03-04 11:00
by Dürr Group GmbH

A62 National Motorway Hörnchenberg Tunnel

Retrofitting of tunnel engineering and safety equipment

Customer: Landesbetrieb Mobilität – Rheinland-Pfalz
Completion: 2010
Tunnel length: 510 m
Tube: 1

Services:

Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, cross-passage lighting, data logging, fire alarm system, CCTV, intercom system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system